Scoping a Care Home Project: Getting It Right Before You Start
Why good scoping saves money, how to produce a scope of works, and when to involve a surveyor.
Contractor Procurement for Care Home Building Projects
How to tender a project, what to put in the pre-qualification questionnaire, and how to evaluate bids.
NHF Schedule of Rates: A Guide for Care Home Managers
What the NHF Schedule of Rates is, how it works, and how to use it to challenge contractor pricing.
Project Management Basics for Care Home Facilities Managers
Programme, risk register, progress reporting -- the essentials of running a building project in a care setting.
Planning Permission for Care Home Projects
Permitted development, full planning applications, and what triggers a requirement for care home planning consent.
CDM Regulations: What Care Homes Need to Know
The Construction (Design and Management) Regulations 2015 and the duties they impose on care home clients.
Snagging and Defects in Building Projects
How to carry out a snagging inspection, what the defects liability period covers, and how to enforce it.
Asbestos management plan: what care homes are required to have and where most fall short
The duty to manage under CAR 2012, what the plan must contain, and the contractor briefing process that most providers skip.
Gas safety in care homes: CP12 certificates, annual service records and what competent person means
The annual legal requirement, the CP12 versus the service, and how to verify your engineer's Gas Safe registration.
Care home flat roof maintenance: the inspection cycle, common failure points and when to get a specialist
Bi-annual inspections, drainage, membrane upstands and the indicators that tell you a specialist survey is overdue.
Wet room specification in care homes: Altro Whiterock vs ceramic tile -- a cost and maintenance comparison
The real-world cost difference, the infection control case for Altro, and when ceramic tile is the right answer.
NHF Schedule of Rates explained: how to use SOR pricing to benchmark your contractor quotes
Twenty years of costing against SOR in practice -- how the schedule works, how to read a quote against it, and where contractors pad margins.
What is the NHF Schedule of Rates and why does it matter for care home maintenance budgets?
The plain English explainer -- what SOR is, what it isn't, and how care home providers use it every day.
How to brief a contractor properly: scope of work, assumptions, exclusions and what to put in writing
The three things most care home maintenance briefs are missing and why they cause every variation claim you've ever dealt with.
LOLER 1998: A Complete Guide for Care Home Maintenance Managers
Every item of lifting equipment in a care home -- hoists, slings, stairlifts, passenger lifts -- has a legal examination requirement. Here is what LOLER requires, what the records must contain, and what happens when a site is inspected.
Pressure Systems Safety Regulations 2000: What Care Home Plant Rooms Must Comply With
If your plant room contains a calorifier, pressurised hot water vessel or steam plant, PSSR 2000 applies. The written scheme of examination is the central requirement -- without it, you are in breach from the moment the system operates.
Ventilation Servicing in Care Homes: What Needs Doing, How Often, and What the Records Must Show
Most care home ventilation maintenance contracts clean the grilles and service the fans. TR/19 duct cleans, fire damper drop tests and airflow verification rarely feature. Here is what a complete ventilation maintenance programme looks like.
Project Handover and Commissioning
What you should receive at handover, what commissioning involves, and how to ensure systems work before the contractor leaves.
LOLER Thorough Examinations: Documentation, Registers and What Happens When They Lapse
The 6-monthly thorough examination under LOLER 1998 is a formal legal requirement, not a service check. The documentation it produces is what CQC and HSE ask to see. Here is what the register must contain.
PSSR 2000 Written Scheme of Examination: A Practical Guide for Care Home Plant Rooms
The written scheme of examination is the central PSSR 2000 document. Without it, every pressure system in your plant room is technically in breach. Here is what it must contain and who can produce it.
CDM 2015 in Care Homes: When the Regulations Apply, Who the Duty Holders Are and What They Must Do
CDM 2015 applies to virtually all construction work in care homes. The client duty sits with the care provider -- not the contractor. Most care operators do not know this. Here is what it means in practice.
Contractor Management in Care Homes: Competency Checks, Permits to Work and Induction
Allowing an unverified contractor onto a care home site creates liability for the provider. A contractor management system is not bureaucracy -- it is the evidence that you exercised reasonable care. Here is what it must cover.
Excavation Safety in Care Home Grounds: What HSG47 Actually Requires Before Anyone Breaks Ground
Care home grounds are riddled with undocumented services from decades of incremental work. What HSE's own guidance requires before digging starts, and what a competent contractor's method statement should actually contain.
Manual Handling on Care Property Maintenance Work: What the Regulations Actually Require
The Manual Handling Operations Regulations don't set a maximum weight -- they require avoiding, assessing and reducing risk. What that means in practice for a maintenance or refurbishment job.
Peer insight
Show me what other managers do
See how experienced care home managers handle the same challenges. Real situations, real decisions -- not what the guidance says, what people actually do.
Got a question?
Ask CareHomeDesk
Plain English. UK care property. Instant answer with cited sources.