What you should receive at handover, what commissioning involves, and how to ensure systems work before the contractor leaves.

4 min readCareHomeDesk Knowledge Base

Practical completion

Practical completion is the point at which the works are substantially complete -- the building can be used for its intended purpose, even if minor items remain outstanding (which are recorded on the snagging list). Practical completion triggers: start of the defects liability period, release of the first half of retention, and transfer of insurance responsibility from contractor to client.

Commissioning

Commissioning is the process of testing and adjusting installed systems -- heating, ventilation, electrical, plumbing, fire detection, access control -- to confirm they operate correctly and in accordance with the specification. Commissioning records (typically O&M manuals, commissioning certificates, test results) must be provided as part of the handover pack. Do not accept handover of a project without commissioning records for all installed systems.

Handover pack contents

A complete handover pack should include: as-built drawings (updated to reflect any changes from the original design during construction), operation and maintenance (O&M) manuals for all installed systems and equipment, commissioning certificates and test records, warranties (from manufacturers and contractors), the CDM health and safety file, and guarantees (e.g. roofing guarantee, specialist coating guarantee). Retain the entire pack permanently.

Staff induction on new systems

Where a project has introduced new systems (a new heating control system, a new nurse call system, upgraded fire detection), staff must be inducted in their operation before handover is complete. The contractor or system supplier should provide training as part of the contract deliverable. Record the training in the staff training log. A system that staff do not know how to use -- even if technically commissioned -- is not a complete handover.

Put this into practice

CareHomeDesk gives you compliance checklists, maintenance logs, and contractor management tools built around exactly this kind of knowledge.

Join the waitlistMore articles

More in Project Delivery

Scoping a Care Home Project: Getting It Right Before You Start
Why good scoping saves money, how to produce a scope of works, and when to involve a surveyor.
6 min read →
Contractor Procurement for Care Home Building Projects
How to tender a project, what to put in the pre-qualification questionnaire, and how to evaluate bids.
6 min read →
NHF Schedule of Rates: A Guide for Care Home Managers
What the NHF Schedule of Rates is, how it works, and how to use it to challenge contractor pricing.
5 min read →