Electrical Installation Condition Reports are expected by CQC, HSE and insurers. The accepted standard for care homes is every five years. Here is what the report must contain and how to verify your electrician is qualified.
BS 7671 requires that the maximum period between EICRs be set by a competent person based on the type of installation and its use, rather than prescribing a single fixed interval for all buildings. For care homes, given continuous heavy use and the vulnerability of residents, five years is the widely accepted sector benchmark for maximum interval between reports, and many operators choose a shorter cycle for higher-risk areas such as kitchens, laundries and assisted bathing rooms.
An EICR should be carried out by someone holding recognised inspection and testing competence, evidenced by qualifications such as City and Guilds 2391 or 2394/2395, and ideally registered with a competent person scheme such as NICEIC or NAPIT. Verifying this before commissioning the work protects the operator from relying on a report that may not be accepted by CQC or an insurer as valid evidence of a properly conducted inspection.
A compliant EICR records the extent and limitations of the inspection, details of the installation tested, the observations made against each circuit with a classification code (C1, C2, C3 or FI for further investigation), and an overall assessment of whether the installation is satisfactory or unsatisfactory for continued use. The report should be signed by the inspector and, where a second person checked the work, countersigned, providing an auditable record of who takes responsibility for the findings.
An EICR that records C1 or C2 observations without a documented remediation trail is treated by CQC as direct evidence that Regulation 12 -- safe care and treatment -- is not being met, since the operator has been made aware of a dangerous or potentially dangerous condition and has not demonstrated it was addressed. Insurers take a similarly strict view, and may decline or reduce a claim following an electrical incident if a current, satisfactory EICR cannot be produced at the time of the loss.
Maintain a single file per site containing the current EICR, evidence of the inspector's qualifications and scheme registration, and remediation certificates for any C1 or C2 findings identified. Diarise the renewal date well ahead of the five-year expiry and treat any change of use, refurbishment or significant load addition as a trigger for an earlier reinspection rather than waiting for the scheduled cycle to complete.